Мобильная версия
To receive the price-list by e-mail.

Phone:
E-mail*:
5-4*=
Subscribe to newsletter:

Fields marked * is required
To receive the catalogue by mail.

Your name*:
Phone*:
E-mail*:
City*:
Organization*:
Text of the application*:
5-4*=
Subscribe to newsletter:

Fields marked * is required
To receive the discount by mail.

Your name*:
Phone*:
E-mail*:
Оборудование*:
5-4*=
Subscribe to newsletter:

Fields marked * is required
Learn coordinates representative of the plant in your area.

Your name*:
Phone*:
E-mail*:
*:
city dealer*:
5-4*=
Subscribe to newsletter:

Fields marked * is required
Request a call back.
При отправке заявки с сайта Вы получите дополнительную скидку.

Phone*:
5-4*=
Subscribe to newsletter:

Fields marked * is required
Строительные машины - растворонасосы, штукатурные станции, установки хранения и выдачи раствора, универсальные штукатурные машины, штукатурные агрегаты, - предназначенные для механизации основных отделочных работ
Products
Our Production
Road and building equipment
Lifting and crane equipment

Lift facade

Lift facade (cot construction) is designed for lifting two people, building materials and tools directly to the workplace to carry out painting and decorating the outside of buildings and structures up to 150 meters.

Suspension of construction on the buildings of the cradle with a flat roof using the console. One - for single facade lift, two - for a double. The scope of delivery facade lift may include the console, providing cradle flight distance 0,9 m 1,5 m 2,5 m from the walls of the building that provides the performance of work both on flat vertical surfaces, and on projecting corners of buildings or structures.

Building maintenance units are equipped with:
  • consoles on the roof of the building for the suspension of construction cradles;
  • two catcher insurance;
  • portable remote control;
  • rope, cable.

Can also be supplied separately winches LEF-500 (electric friction, r / n 500 kg, lifting height up to 150m), the consoles with the emission of 0,75, 1,5, 2,5 m from the building and other spare parts. At the request of the customer's building cradle is equipped with reinforced concrete counterweight weighing 50 kg or metal weighing 20 kg, iron load differs from the convenience of installation of concrete, due to the small weight and long lifespan.
Увеличить
Lift facade

E-mail*:
Phone*:
5-4*=
Text*:
Subscribe to newsletter:

Fields marked * is required.
Send request
Technical parameters
Lift facade (cot construction)
Payload, kg 300
Lifting height max, m 150
Lifting speed, m / min 5,5
Tractive gain one winch, kN 5
Motor power, kW 0,75
Number of winches, ea. 2
The diameter of the hoisting rope, mm 8,8
The diameter of a safety rope, mm 8,8
The size of the working platform-cradle (length, width, height of fence), mm 4000 * 860 * 1200
Dimensions of the lift platform-cradle (length, width, height of fence), mm 4540 * 940 * 1670
Type winch double-drum, with a driving pulley ropes
Device facade lifts

Lift facade consists of a frame, lifting machinery, catches and electrical equipment. Skeleton of a welded structure made of pipes and corners at the ends of its established mechanisms of catches and guide rollers of lifting and safety ropes. Under the deck working platform having a fence, mounted lifting mechanism, which is a double-drum winch. In leading drum winch built a three-gear drive, details of which operate in a closed oil bath. Friction winch mechanism for lifting pulls no lifting ropes on the drum, and moves on them due to friction. This cradle can be raised to any height, determined by the length of rope.
Tilt mechanism is equipped with two automatic brakes - disc and drum brakes. Disc - gruzouporny brake is built into the leading drum winch, operates in case of excess load moment. Drum brakes - automatic stop, installed on the drive shaft of the planetary gear, a spring closes when you turn off the current in the control circuit.
Suspended platforms suspended on two lifts and two safety ropes, the upper ends of which are fixed on the consoles installed on the roof of the building. The lower ends of the ropes, weights inventory.
When breakage or weakening of the ropes included automatically interlocked with catcher, and the cradle hangs on the safety line. Electrical control circuit with opens.
In the control circuit switches are the extreme top and bottom of the cradle. In the event of a power outage cradle is equipped with a hand-driven winch.
Within the construction site construction cradle moves on wheels, mounted on the frame. From object to object without disassembling it shipped by truck.

Environment, which can be operated lift facade:
  • temperature of -40 to +40 ° C;
  • the upper value of relative humidity at 25 ° C of the atmospheric type II according to GOST 15150 - 80%;
  • wind area installation GOST 1451 - IV;
  • wind speed at 10 m, not more than 14 m / s;
  • explosion - an explosive;
  • fire hazard - fire risk.
Technical requirements are satisfied by the facade lifts:
  • building cradle should be done in the form of a skeleton with a platform to accommodate the worker (workers). Floor area per person cradles must be at least 0,7 m2. Paul bassinet should not be slippery;
  • one should be suspended cradle hung on a hoisting cable and have a safety line;
  • two to be suspended cradle suspended on two ropes, and have two safety rope;
  • load one hanging cradles must be not less than 120 kg, two suspended - not less than 300 kg;
  • construction cradles around the perimeter should be protected. The height of the fence with a non-working party should not be less than 1200 mm, and from the front of work - not less than 1000 mm. Device cradle doors in the fence is not permitted;
  • barriers should be designed for a load of not less than 1300 N for attaching carabiners safety belts and tethers for working tool;
  • construction should be suspended from the cradle to the console, installed on top of the building (construction). Coefficient of stability freely arranged consoles should be not less than 2,2;
  • sustainability of building cradles at work and with the relocation should be checked by calculation. In order to prevent buildup cradles, they can be fitted to support the construction;
  • building the cradle must be fitted with rollers to move along the ground.


НАШИ ПАРТНЕРЫ